TRM Environmental Case Studies

 When you work with TRM Environmental:

  • You’re confident that projects are well-managed with a balanced perspective of big-picture outcomes and day-to-day details.

  • You’re satisfied you have partnered with a firm with a proven track record of delivering cost-effective results leading to solutions.

  • You’re secure knowing that all work is conducted in accordance with approved plans, specifications, and change orders.

  • You’re prepared and ready for what comes next.

  • You’re relieved you’ve been educated on the details of all that’s required to ensure work is completed correctly.

  • You’re thankful issues are addressed proactively, completely, and thoroughly.

 An overview of selected recent projects:

A trench dug next to a road, a ladder rests on the road, and pipes are visible wrapped in plastic.

Solids Handling Upgrades, GHD Consulting Services, Inc.

Construction management support services for the solids handling upgrades at the Oneida County Sewer District, including uploading reports into an internet-based tracking system, providing documentation management, and field oversight. 

Supporting the associated Force Main upgrades, including oversight of the jack and bore of the subsurface to support the force main. 

Village of Yorkville, O'Brien & Gere Engineers, Inc./ Village of New Hartford, GHD Consulting Services, Inc. 

Construction observation support services for the Village of Yorkville, C12 Sewer Rehabilitation which includes cured-in-place lining (full length between manholes), lateral connection repairs (grouting, cured-in-place lining), cured-in-place spot liners, mainline pipe joint pressure testing and grouting, drilling and grouting of manholes – pipe seal/channel/wall, open-cut spot repairs, sanitary sewer lateral cleaning and televising, sanitary sewer main line cleaning and televising, manhole frame and cover adjustments, installation of new manholes, restoration, and infiltration and inflow assessment via acoustic metering.  

an excavator is positioned behind a trench, a teal pipe is exposed within the trench

US Environmental Protection Agency – Regions 2 & 5, Toeroek Associates, Inc.

Tecumseh Products Site, Tecumseh, MI - Supporting evaluation of the Corrective Measures Plan and associated extent of contamination presentation, risk assessment, source leaching assessment, land use controls, and remedy assessment. Off-site vapor intrusion impacts required vapor mitigation systems in homes where indoor air samples showed vapor intrusion impacts.

Former Hovensa Facility, Virgin Islands/Former Union Carbide Facility, Puerto Rico/Former Port Mobil Facility, New York City, NY - Supporting evaluation of the remedy demonstration for 100% design, construction quality assurance plan, and operation and maintenance plan for the implementation of natural source zone depletion remedies for sites in the US Territories of Puerto Rico and the US Virgin Islands and the NYS Port Mobil site. Includes assessing community outreach.

A lake off to the left is surrounded by hilly land. An plastic barricade cuts through the land to stop rocks from falling.

Mohawk Valley Edge & ARCO Design 

Perform the wetland delineation, jurisdictional determination, and a plant and habitat assessment for the Skyline Drive development in Rome, NY.  

A stake is stuck in a hole in the ground filled with water.

Commercial Property Phase I Assessments

Perform ASTM-compliant Phase I Environmental Site Assessments for commercial sites at properties in Oneida County, including a parcel on the former Griffiss Air Force Base along Brooks Road in Rome, NY, and a previously remediated subdivided parcel in New Hartford, NY.  

a large piece of machinery is laid into a trench in the ground on a construction site.

Village of Ravena/ Village of Mechanicsville, Barton & Loguidice Engineers 

Provide construction inspection and field engineering services for drinking water lines upgrades in the greater Albany area installed via horizontal directional drilling. 

Coordinate with lead engineer to relay constructability issues and propose suggested resolutions to the project engineer for approval while collaborating closely with municipal representatives, NYS DOT engineers, and contractor representatives. 

Our staff met the NYS DOT requirements to be certified as Key Staff responsible for traffic issues associated with projects subject to NYS DOT requirements.  

a tree in the foreground is surrounded by wood creating a path. A small building is shown in the background

Village of Pulaski & C2AE

Perform the long-form NYS SEQR and prepare the associated report.